Solar Panel Installation in Montgomery, AL

Compare 15 solar panel installation contractors near you in Montgomery and surrounding area with an average rating of 4.5/5. Get free quotes, read reviews, and find the right pro for your project.

Last updated March 22, 2026

Other Businesses in This Area

Solar Tech HVAC

Century Roofing, a division of Galloway Homes, LLC

5.03+ years online
centuryroofingpros.com

Electric Concepts

5.0~7 years online
ecopoweron.com

Energy Southeast (formerly AMEA)

5.03½+ years online
energysoutheast.com

GREEN IS BETTER INC

5.011+ years online
greenisbetterinc.com

Mid-South Electric Company Inc

5.0

QWRT Solar Energy Group

5.0

SurePro Exteriors

5.0~3 years online
sure-pro.com

Mr. Electric of Montgomery

4.930+ years online
mrelectric.com/montgomery-al

Solar Gard Enterprises

4.8

All Phase Electric

4.719 years online
goallphase.com

Inline Electric Supply Co. - Montgomery

4.726½+ years online
inlineelectric.com

Motor Home Specialist Alabama

4.44½+ years online
bluecompassrv.com/locations/alabama/montgomery/rvs-for-sale

Alabama Power Company Southern Division Office

2.728+ years online
alabamapower.com/residential.html

Orbital Solar Services / Black Bear

2.0

Solar Panel Installation in Nearby AL Cities

Solar Panel Installation in Montgomery, AL

Montgomery solar work runs through Alabama Power's net-metering at retail rate plus the 30% federal ITC. Typical residential array: 8–12 kW at 5 peak sun hours, payback 8–12 years. Most installers use Q CELLS or Silfab panels paired with Enphase microinverters. Permits go through Montgomery Planning & Development.

Montgomery's tornado risk drives interest in roof condition assessment before solar install. Battery storage is increasingly popular for storm-driven outage protection. The Maxwell Air Force Base community and state government workforce drive steady demand.

Frequently Asked Questions

Does Alabama Power offer net metering?
Yes, Alabama Power provides net metering for residential systems with monthly fees.
What incentives apply?
The 30% federal ITC. Combined with electricity savings, payback runs 8-12 years.
Should I add batteries?
Increasingly yes for tornado and storm-driven outage protection.

About NeedInstall

NeedInstall helps connect customers with local installation professionals across Montgomery and surrounding communities. Featured contractors have claimed their profile and verified their business information. Listings marked as "Verified Pro" have been confirmed by the business owner.