
Concrete & Paving in Bakersfield, CA
Compare 29 concrete & paving contractors near you in Bakersfield and surrounding area with an average rating of 4.7/5. Get free quotes, read reviews, and find the right pro for your project.
Last updated March 22, 2026
Most pros respond within 2–24 hours
Verified Pro Installers


Cisneros Decorative Concrete

National Concrete

JJ Concrete & Landscaping
Other Businesses in This Area
Bakerfield Paving Inc
5.0~4 years onlineBakersfield Concrete Contractors
5.02½+ years onlineCalderon Concrete
5.0Cherokee Concrete
5.0Civil Star Concrete Construction
5.0Greg M. Velaquez Concrete Construction
5.05½+ years onlineKern County Custom Concrete inc
5.0~3 years onlinePerez Asphalt Construction
5.018½+ years onlineStars Concrete Contractor
5.03+ years onlineCali Concrete
4.7Kern Crushing Concrete and asphalt crushing in recycling
4.716½+ years onlineRosedale Concrete Construction Inc
4.615+ years onlineAsphalt & Concrete Recycling
4.1Golden Empire Concrete Co
3.930+ years onlineBakersfield Concrete Limited Partnership
3.7Kern Asphalt Paving & Sealing Co., Inc.
3.716½+ years onlineCerda Concrete
3.612 years onlineConcrete & Paving in Nearby CA Cities
Other Services in Bakersfield
Concrete & Paving in Bakersfield, CA
Bakersfield concrete and paving has to handle Central Valley clay-loam soils, intense summer UV, and PG&E TOU rates that make running cooling all summer expensive — driveways without proper sub-base crack within a few seasons. The 100-110°F summer pours need cooling additives and careful curing schedules. Kern County dust during pours requires careful surface protection. NeedInstall connects you with Bakersfield concrete contractors who pour 4,500-5,500 PSI mixes, use 4-6 inches of Class 2 base, and detail control joints every 8-10 ft.
Bakersfield concrete driveways run $9-$15 per sq ft installed. Permits required for new driveways and apron tie-ins ($85-$200). CA requires a C-8 Concrete Contractor license. Air-entrainment less critical than freeze-thaw climates but mix design matters for UV scaling. Avoid pours above 95°F ambient or schedule for early morning. Allow 28 days curing before sealer.
Frequently Asked Questions
- Stamped or plain?
- Stamped looks great but the colored release fades faster under Bakersfield UV — plan to reseal every 2-3 years vs every 5 for plain. Charcoal or earth-tone integral colors fade slower than terra-cotta or red.
- Will my old driveway need full removal?
- If cracks are over ¼ inch, it's heaving, or surface is scaling, yes — overlays don't fix structural issues. Cleaner to tear out and re-pour with proper base.
- How long until I can park?
- Foot traffic 24-48 hours, light vehicles 7 days, full loads 28 days. Don't rush it — early loading damages permanently.
About NeedInstall
NeedInstall helps connect customers with local installation professionals across Bakersfield and surrounding communities. Featured contractors have claimed their profile and verified their business information. Listings marked as "Verified Pro" have been confirmed by the business owner.