
Generator Installation in Los Angeles, CA
Compare 28 generator installation contractors near you in Los Angeles and surrounding area with an average rating of 4.7/5. Get free quotes, read reviews, and find the right pro for your project.
Last updated March 22, 2026
Most pros respond within 2–24 hours
Verified Pro Installers


All American Generator Services

Express Electrical Services

LT Generators
Other Businesses in This Area
Los Angeles Power Systems
SMS Generators
~28 years onlineAmericano Electrical Solutions LLC
5.02½+ years onlineGory Electric Motors & Emergency Generator Services
5.0JM2 Generator Repair LLC
5.0Win Electric Los Angeles
5.0Zoom Electricians
5.06½+ years onlineA-1 Generator Services
4.9Expert Electric Group
4.97+ years onlineGenerator Supercenter of Inland Empire
4.94½+ years onlineJerry & Sons Electric
4.8Oliphant Equipment Repair
4.8LA Mobile Generator Repair
4.7Powell Electric
4.7~22 years onlineSmith Powerhouse Inc
4.75+ years onlineDuthie Power Services
4.429+ years onlineElite Generators Inc.
4.214 years onlineAffordable Generator Services, Inc.
4.018½+ years onlineAdvanced Generator Service
3.8Generator Installation in Nearby CA Cities
Other Services in Los Angeles
Generator Installation in Los Angeles, CA
Los Angeles generator installation makes sense given recurring SCE/LADWP PSPS events during Santa Ana wind season — many feeders are pre-emptively de-energized for 24-72 hours during high fire-weather. Whole-home standby on natural gas keeps homes running through PSPS without the noise/refueling headaches of portable units. Older Beverly Hills and Hancock Park homes may need a service upgrade. NeedInstall connects you with LA generator installers familiar with SCE/LADWP interconnection rules, LA permits, and HOA aesthetic rules.
LA generator installs run $7,500-$17,000 for 22-26 kW Generac, Kohler, or Cummins units. CA requires a C-10 EC license. Permits ($175-$450). SoCalGas tap may add $500-$1,500. Setbacks: 5 ft from structures, 18 inches from PL, mind HOA rules. SCE/LADWP interconnection 2-4 weeks.
Frequently Asked Questions
- Worth it for PSPS?
- Yes — SCE/LADWP have called multi-day PSPS events. Generator turns blackout into non-event.
- Battery alternative?
- Tesla Powerwall pairs with solar to handle most PSPS events.
- Permit lead time?
- LA Building 4-8 weeks. SCE/LADWP interconnection 2-4 weeks.
About NeedInstall
NeedInstall helps connect customers with local installation professionals across Los Angeles and surrounding communities. Featured contractors have claimed their profile and verified their business information. Listings marked as "Verified Pro" have been confirmed by the business owner.