
Concrete & Paving in Dover, DE
Compare 29 concrete & paving contractors near you in Dover and surrounding area with an average rating of 4.5/5. Get free quotes, read reviews, and find the right pro for your project.
Last updated March 22, 2026
One request, multiple quotes — don't overpay
Verified Pro Installers
Other Businesses in This Area
B&A Home Improvement General Services
5.03½+ years onlineCoker Concrete LLC
5.0JD Asphalt Inc.
5.09+ years onlineMitten Construction Co
5.010+ years onlinePaco Construction & Landscaping LLC
5.0R. A. Harrison
5.07+ years onlineSeal Pro Paving & Sealcoating LLC
5.09 mo onlineS.E. Doyle General Contractor LLC
5.0Shoreline Masonry LLC
5.01+ year onlineSolid Ground Concrete & Pavers LLC
5.029+ years onlineWillies Asphalt & Sealcoating LLC
5.09 mo onlineAffordable Asphalt LLC
4.89+ years onlinePioneer Materials
4.8Heritage Concrete
4.715+ years onlineThe Brick Doctor, Inc.
4.6~26 years onlineBrick Brothers Inc.
4.310½+ years onlinePennsy Supply
4.3Sunnyfield Contractors, Inc.
3.4Teal Construction Inc
2.9~25 years onlineMoorer's Concrete
2.5Atlantic Concrete Co
2.2Concrete & Paving in Nearby DE Cities
Other Services in Dover
Concrete & Paving in Dover, DE
Dover DE concrete and paving has to handle Mid-Atlantic freeze-thaw cycles, sandy-clay soils on Kent County's coastal plain, and the road salt exposure that scales weak mixes. Slabs without proper air entrainment crack within 2-3 winters. NeedInstall connects you with Dover concrete contractors who pour 4,500-5,500 PSI air-entrained mixes, use 4-6 inches of compacted base, and detail control joints every 8-10 ft.
Dover concrete driveways run $9-$14 per sq ft installed. Permits required for new driveways and apron tie-ins ($75-$175). DE requires a state contractor's license. Air-entrained 6-bag mixes with W/C ≤0.45 for freeze-thaw durability. Allow 28 days curing before sealing or de-icer use.
Frequently Asked Questions
- Why does my driveway scale?
- Two reasons: weak mix without air entrainment, and de-icer use within 12 months of pour. Spec 4,500+ PSI air-entrained and skip salt the first winter.
- How long for install?
- 3-5 days typical: tearout, base prep, pour, cure. 28 days before sealer or heavy loads.
- Stamped concrete worth it?
- Stamped looks great but colored release fades faster under salt and UV. Plan to reseal every 2-3 years vs every 5 for plain.
About NeedInstall
NeedInstall helps connect customers with local installation professionals across Dover and surrounding communities. Featured contractors have claimed their profile and verified their business information. Listings marked as "Verified Pro" have been confirmed by the business owner.

