EV Charger Installation in Portland, ME

Compare 15 ev charger installation contractors near you in Portland and surrounding area with an average rating of 3.3/5. Get free quotes, read reviews, and find the right pro for your project.

Last updated April 9, 2026

Verified Pro Installers

Other Businesses in This Area

Jule Charging Station

3½+ years online
julepower.com

ChargePoint Charging Station

5.019 years online
chargepoint.com

Greater Portland Electric

4.84½+ years online
greaterportlandelectric.comGet a Free Quote

S. Portland Community Center EV Charging Station

4.819 years online
chargepoint.com

Auto Tech & Electric

4.7

Casco Bay Electric, LLC.

4.715½+ years online
cascobayelectric.com

EVgo Charging Station

3.9~24 years online
evgo.com/find-a-charger/me/westbrook/90-rock-row-351491

Electrify America Charging Station

3.2~10 years online
electrifyamerica.com/locate-charger/me/scarborough/500-gallery-blvd/100634

Electric Vehicle Charging Station

2.0
afdc.energy.gov/fuels/electricity_locations.htmlGet a Free Quote

Tesla Supercharger

1.933½+ years online
tesla.com/charge

Tesla Destination Charger

1.033½+ years online
tesla.com/charging

EV Charger Installation in Nearby ME Cities

EV Charger Installation in Portland, ME

Portland, ME EV-charger installers serve Cumberland County — growing tech and creative-class workforce. Most installs are 40-amp hardwired Level 2 (ChargePoint, Wallbox, JuiceBox, Tesla Wall Connector). Portland permits required; CMP serves the area. Many older Portland homes have 100-amp panels.

Growing tech and creative-class workforce drives premium EV adoption. The 30% federal IRA tax credit plus Efficiency Maine rebates make EV adoption attractive. Cold-rated chargers handle Maine winters down to -10°F.

Frequently Asked Questions

Will my Portland panel handle a Level 2 charger?
40-amp Level 2 chargers usually fit on 100-amp panels with a load calc.
What incentives apply?
Efficiency Maine plus the 30% federal IRA tax credit stack.
Will it work in Maine winters?
Yes — cold-rated Level 2 chargers handle -10°F reliably.
How long does install take?
Most Portland Level 2 installs take 3–5 hours.

About NeedInstall

NeedInstall helps connect customers with local installation professionals across Portland and surrounding communities. Featured contractors have claimed their profile and verified their business information. Listings marked as "Verified Pro" have been confirmed by the business owner.

Most pros respond within 2–24 hours